Fort Polk Consolidated Supply Facility, Ft. Polk, LA
for the U.S. Army Corps of Engineers
Mr. Luquet managed the Architectural and Material Handling Design while integrating the intricate Process and Inventory Control Systems. The project was programmed and designed as one of the most technologically advanced and highly automated facilities of its kind. Included were such features as -Bar Coding Control of Palletized, rack, and bin-stored inventory; Radio Frequency Communication; High Reach, Wire Guided and Man-up Inventory Retrieval Vehicles; High Floor loading capacities and “Superflat” slabs designed as part of the high density, narrow-aisle warehousing facility; Customer service, Retail type, Sales Centers. 160,000sf. Construction Cost: $18,500,000.00